Passa al contenuto principale

Internal Lab Calibrations

The included default layout has event configurations to allow for the completion of calibrations through a lab pathway of events beginning with a Receive In Lab Event. The process then moves all items to In Lab before items can be either calibrated or repaired. In cases of failure, a bolt-on process can be turned on out of the box and will move to Await. OOT Review with the intent a lab manager will review the failure before sending it to Await. Q.A. Upon completion of the Q.A. event, the items will be determined to move back to production or removed from service. A Return Equipment event will be used to track the return of the items as they leave the calibration laboratory.